The road to your dream home

Building a house is not a purchase but a process – with authorities, evidence and decisions that build on one another. Here is what happens in which order, who does what, and at which point you are asked.

Finished house on a slope with a warm timber façade, lit interiors, lawn and pool at dusk

Four stages. No promises we cannot keep.

You will deliberately find no timings on this page. How long a building project takes is largely decided by bodies we have no influence over: the building authority, your bank, the utilities, the ground.

What we provide instead is sequence and responsibility – and, for your specific project, a reliable programme as soon as the site and the consent position are settled.

01 · Clarify

What we need to know first

  1. 1.1

    First conversation

    We listen before we draw: how many people will live in the house, what your daily life looks like, what budget stands behind it, what timeframe matters to you. At the end you get an honest assessment of whether and how your project can be realised – including when the answer is "not like this".

  2. 1.2

    Checking the site

    We study the development plan: permitted roof form and pitch, ridge direction, eaves and ridge height, site coverage and floor area ratios, separation distances, building lines. Added to that are access, slope, services and whether a crane can be set up at all. This check determines what may be built on your plot – everything else follows from it.

  3. 1.3

    Ground and services

    A soil survey establishes bearing capacity, groundwater level and drainage. It determines the foundations, the basement and the drainage strategy, and is therefore one of the biggest cost levers of the whole project. In parallel we clarify with the utilities how water, drainage, electricity and telecoms reach the house.

02 · Design

The design takes shape

  1. 2.1

    Design by the architect

    Now it gets drawn – by an architect, not out of a catalogue. From your requirements and the constraints of the site comes a preliminary design with floor plans, elevations and sections. We go through it with you, change it, discard it and draw again until the plan fits how you actually live. You can also come with your own architect: we then take over from the detailed design onwards.

  2. 2.2

    Fixed-price offer and specification

    On the basis of the agreed design you receive a binding offer – together with a specification that names item by item what is included and what is not. What is not written there is not commissioned. This clarity before signing matters more to us than a low entry figure.

  3. 2.3

    Building contract

    The contract under German consumer building law brings together the design, the specification, the price and the payment schedule. You have the statutory right of withdrawal, and payments are tied to construction progress rather than to dates. Take your time to review it – ideally with your solicitor or an independent building adviser.

  4. 2.4

    Planning application

    We prepare the consent drawings with all required evidence – structural, thermal, acoustic and drainage – and submit the application to the building authority. How long the authority takes is outside our control; we keep you informed of every update and continue with the detailed design in the meantime.

  5. 2.5

    Specification meeting

    Floors, doors, windows, sanitaryware, tiles, staircase, electrical fittings and heating technology are selected and fixed in writing. What is decided here goes into production exactly as agreed – which is precisely why the fixed price stays fixed.

Worker assembling a floor element in the manufacturing hall
Detailed design becomes production: assembling a floor element in our hall.

03 · Build

From the plant to your site

  1. 3.1

    Detailed design

    The approved design becomes a manufacturing drawing to the millimetre: every wall, floor and roof element with stud spacing, openings, conduits, boxes and connection points. What is properly resolved here does not have to be improvised on site.

  2. 3.2

    Prefabrication in our own plant

    In our hall the components are made independently of the weather: framing cut and assembled, sheathing fixed, insulation placed, windows fitted, service zone prepared. Every element is checked before it leaves the plant. Because the work is dry, no construction moisture enters the structure.

  3. 3.3

    Foundations

    In parallel with production, the slab or basement is built on the plot, together with earthworks, drainage and service connections. The foundation is surveyed – the tolerances of prefabrication demand an exact base.

  4. 3.4

    Erection

    The elements arrive by low-loader and are set with a mobile crane. An empty slab becomes a closed, weathertight building envelope – the day the house stands as a house for the first time. You are welcome to be there.

  5. 3.5

    Fit-out and building services

    Under a roof, the electrical, plumbing, heating and ventilation works follow, then screed, internal fit-out, finishes and the components that can only be installed on site. One contact person coordinates the trades; you do not have to find tradespeople or juggle appointments.

A mobile crane lowers a prefabricated wall element over the building site
Erection day: the crane sets the prefabricated elements onto the foundations.

04 · Hand over

And afterwards

  1. 4.1

    Blower door test and measurements

    The airtightness of the envelope is measured, not asserted – a prerequisite for the efficiency standard and for the funding commitment. Heating and ventilation are commissioned and the values documented.

  2. 4.2

    Handover inspection

    We walk through the house together, room by room. Anything not right goes into the record and is put right before the final account. You are welcome to bring an independent surveyor – we have nothing to hide.

  3. 4.3

    Handover and documentation

    You receive the keys, together with the complete documentation: as-built drawings, certificates, operating instructions for the systems, maintenance intervals and the papers you need for funding and insurance.

  4. 4.4

    Warranty

    Our responsibility does not end at handover. The statutory warranty applies, and we remain your contact for questions, adjustments and anything that shows up during the first year in use.

What you contribute – and what we take on

So it is clear from the start where your decision is needed and where you can rely on us.

Yours

  • The plot – bought or concretely in prospect.
  • The financing with your bank; we supply the documents for it.
  • The decisions on layout, specification and materials.
  • Your time for the design discussions and for the handover inspection.

Ours

  • Checking the development plan, the ground and the services.
  • Design, consent drawings, structural design and all certificates.
  • Prefabrication in our own plant and erection on your site.
  • Coordination of all trades through to handover – one contact person.

Frequently asked questions about the process

Can my own architect design the house?

Yes. Many clients come to us with a finished design or with their architect – we then take over from the detailed design onwards and carry out prefabrication and construction. Equally, the whole design can stay with us and our architect draws it. Both routes are familiar to us, and both are equally good.

Why do you not state build times?

Because most of the duration is not in our hands. The processing time of the building authority, your bank’s commitment, the availability of connections and the weather during earthworks all shape the programme. We give you a reliable schedule for your specific project once the site and the consent position are settled – but not a number of weeks on a website that nobody can keep.

When do I have to pay what?

The payment schedule is part of the building contract and is tied to construction progress, not to calendar dates. Each instalment only falls due once the corresponding work has been carried out. The security required by German consumer building law is included.

What if I want to change something during design?

Changes are unproblematic up to the specification meeting and increasingly expensive after it – because the detailed design is then running and material has been ordered. That is why we deliberately take time during the design stage. If something changes after signing, you receive a variation quotation in advance with the price and the effect on the programme; nothing is charged silently.

Do I have to organise tradespeople myself?

No. With turnkey construction we coordinate all trades and give you one contact person. If you want to take on work yourself – decorating or landscaping, for instance – we define that before signing so the interfaces and the fixed price stay unambiguous.

Do you help with funding and financing?

We prepare the evidence required for KfW funding and work with certified energy efficiency experts. You arrange the financing itself with your bank – we supply the documents it needs and align the payment schedule with it.

The first step is a conversation, not a contract.

Bring whatever you have – a plot, a sketch, an idea or just a question. We will tell you honestly what can come of it.